created by: b.kordenbrock; 2006
we are PayPal Verified and prefer payments via PayPal...we do however, accept any major credit card, money orders, cashier's checks, and cash. for credit card payments please give us a call so we can complete the transaction over the phone quickly & securely.
|
the latest...
Services: - welding and/or fabrication (steel & aluminum TIG welding, and MIG welding):
- custom mounting brackets
- sheet metal welding (i.e.-intercooler end tanks & mounting brackets)
- exhaust work (full systems, test pipes, extensions, mating new flanges, and more...)
- precision CAD design & production using state-of-the-art CNC machining & MasterCam:
- flanges (though most are through our supplier, we can do custom flanges; i.e.-one-off items)
- v-band assemblies
- customized products (contact us for your application/ideas to help us better serve you)
- weld transitions and much more...
- milling capabilities:
- milling/decking of head and block (contact us for pricing and details)
- custom brackets
- mounts & poly-urethane inserts
- turning/lathe capabilities
- custom weld-on transitions (i.e., blake's 1.75" to 2.5" aluminum turbo outlet transition)
- tie rods/hiem joints
- braces (i.e., turbo to motor/manifold)
- custom built and/or installed roll bars & cages (NHRA & SCCA approved):
- using 1 3/4" DOM or 1 5/8" chromoly material, these cages will suit the needs of any tuner
- 4-point roll bars to full-race cages available (contact us for pricing and details)
|
BmCrace downpipe flange w/ our 2.5" to 4" transition
|
block decking and head milling
CAD design for transition & v-band assembly
|
CAD designed outlet flange and custom machined transition; all done in house
|
our wide variety of services provides the vary backbone of our company. the ability to do many things and do them well is one of our strengths. it
provides the customer with options that other fabrication/motorsport companies may not be able to offer.
roll bar installation @ kms; troys 6-point from AME
|
justin's accord gets a
face lift...see it in the
gallery (all finished!!)
02.11.07
project 1JZ-240 about
75% done. see it in the
shop car portion of the
gallery!
8.26.07
dave's civic hatch gets
some rigid bars and a
sumped OEM tank.
9.02.07